Contact UsHelp/FAQIndexSearch 

Home About Countries Data Evaluation Learning News Projects Publications Research Topics
Search GO   

Home > Tópicos do Dev > Iniciativa de obtenção de energia... > Veja o desenvolvimento... > África...

Página Principal
Acerca da iniciativa
Financiamento de estudos de pré-viabilidade
Entre à Biblioteca IEGAS para encontrar ferramentas que o ajudem a planejar projetos GAS
Estudos de Pre-viabilidade
Veja o desenvolvimento de outras atividades de projeto que se realizam no mundo
Brasil: Projeto “NovaGerar” para os aterros sanitários de Marambaia e Adrianópolis
Canadá: região onde se localiza o aterro Waterloo
Chile: aterros La Feria, Lo Errazuriz e Lepanto no aterro Santiago e Valparaíso
Latvia: aterros Riga e Liepaja
México, Monterrey
Polônia: aterros Torun, Gkansk-Szadolki, Krakow-Barycz e Legajny-Olsztyn
África do Sul: aterros Durban, Mariannhill, Bisasar Road e La Mercy
Turquia: aterro Kemerburgas, Istambul
Uruguai: projeto piloto no aterro Las Rosas, Maldonado
Descubra o enorme potencial de recurso do GAS
Explore nossa Câmara de compensação e participe nos fóruns de discussão
Una-se à IEGAS
Encontre as respostas às perguntas mais freqüentes FAQs
Contate-nos
Ingles Español Portugues
 
Síntese

The Bisasar Road landfill site is situated 7 kilometers (km) from the Durban CBD (Central Business District). A methane generation) model predicts a peak generation of 7 200 m3/hr in 2011. The gas utilization plant is assumed to require 700 m3/hr at around 50% methane to produce one megawatt (1 MW).

The Mariannhill landfill site is located in the western area of the Durban Unicity approximately 20 km to the west of Durban in the Metro area. it is predicted that 1 775 m3/hr will be produced by 2024. Gas utilization equipment of a capacity up to 1.5 MW will be provided.

The La Mercy site is located approximately 35 km north of Durban. Gas production at La Mercy is calculated to peak at 770 m3/hr when the site is closed in 2006. The calculations included a 0.5 MW engine from 2004 to 2013.

The Durban municipal landfill sites at Mariannhill and Bisasar Road are based on a modern cellular sanitary landfill approach with methane recovery already built into the newest cells, and flaring systems installed to dispose of a portion of the methane being generated in an environmentally acceptable manner. The La Mercy landfill is an old rehabilitated landfill soon to be closed, and is equipped with only passive venting.



Site Information

  Bisasar Mariannhill La Mercy
Start of Landfill (Year): 1980 1997 1997
Closing of Landfill (Year/year expected): 2014 2024 Late 2004
TotalSite area (hectares): 44 10.5 7
Area Designated for Land Filling (hectares): NA NA NA
Estimated site Capacity at Time of Site Closure (Million tons): 20 7 1.2
Estimated Capacity of Waste in Place (2003)(Million tons): 10.6 0.83 1.1
Annual Waste Disposal Quantity (2003)(Million tons): 1260 252 108
Installed capacity: 1 MW 1.5 MW 0.5 MW

Baixar o informe do estudo de casos (PDF)

 