Contact UsHelp/FAQIndexSearch 

Home About Countries Data Evaluation Learning News Projects Publications Research Topics
Search GO   

Home > Tópicos do Dev > Iniciativa de obtenção de energia... > Veja o desenvolvimento... > Polônia...

Página Principal
Acerca da iniciativa
Financiamento de estudos de pré-viabilidade
Entre à Biblioteca IEGAS para encontrar ferramentas que o ajudem a planejar projetos GAS
Estudos de Pre-viabilidade
Veja o desenvolvimento de outras atividades de projeto que se realizam no mundo
Brasil: Projeto “NovaGerar” para os aterros sanitários de Marambaia e Adrianópolis
Canadá: região onde se localiza o aterro Waterloo
Chile: aterros La Feria, Lo Errazuriz e Lepanto no aterro Santiago e Valparaíso
Latvia: aterros Riga e Liepaja
México, Monterrey
Polônia: aterros Torun, Gkansk-Szadolki, Krakow-Barycz e Legajny-Olsztyn
África do Sul: aterros Durban, Mariannhill, Bisasar Road e La Mercy
Turquia: aterro Kemerburgas, Istambul
Uruguai: projeto piloto no aterro Las Rosas, Maldonado
Descubra o enorme potencial de recurso do GAS
Explore nossa Câmara de compensação e participe nos fóruns de discussão
Una-se à IEGAS
Encontre as respostas às perguntas mais freqüentes FAQs
Contate-nos
Ingles Español Portugues
 
Síntese

In the present case study for Poland, four landfill gas (LFG) plants are included, i.e: Torun, Szadolki landfill in Gdansk, Barycz in Krakow and Legajny in Olsztyn. The latter two are currently producing energy at the LFG plants.

The size of the landfills included in this case study range from 1.4 – 3.3 million tons, which can be classified as middle size landfills in Poland. The landfill in Torun is 40 years old, in 1991 approximately 650,000 tons were disposed of at the landfill, and since then another 850,000 tons have been disposed of. The other landfills are approximately 25 years old . As a general trend, waste amount generated has increased very rapidly over the last 10 years .



Site Information

  Torun Gdansk Krakow Olsztyn
Start of Landfill (Year): 1964 1973 1974 1975
Closing of Landfill (Year/year expected): 2013 2018 2013 2009
TotalSite area (hectares): 20 56 40 12.5
Area Designated for Land Filling (hectares): 17 45 36 10
Estimated site Capacity at Time of Site Closure (Million tons): 2.2 6.0 5.5 1.7
Estimated Capacity of Waste in Place (2003)(Million tons): 1.6 4.8 3.3 1.4
Annual Waste Disposal Quantity (2003)(Million tons): 80 250 220 60
Installed capacity (MW): 0.73 0.4 0.8 0.5 MW

Baixar o informe do estudo de casos (PDF)

 
Contact Us | Help/FAQ | Index | Search | WB Home
© 2003 The World Bank Group, All Rights Reserved. Terms and Conditions. Privacy Policy.