Contact UsHelp/FAQIndexSearch 

Home About Countries Data Evaluation Learning News Projects Publications Research Topics
Search GO   

Home > Tópicos do Dev > Iniciativa de obtenção de energia... > Veja o desenvolvimento... > Mexico...

Página Principal
Acerca da iniciativa
Financiamento de estudos de pré-viabilidade
Entre à Biblioteca IEGAS para encontrar ferramentas que o ajudem a planejar projetos GAS
Estudos de Pre-viabilidade
Veja o desenvolvimento de outras atividades de projeto que se realizam no mundo
Brasil: Projeto “NovaGerar” para os aterros sanitários de Marambaia e Adrianópolis
Canadá: região onde se localiza o aterro Waterloo
Chile: aterros La Feria, Lo Errazuriz e Lepanto no aterro Santiago e Valparaíso
Latvia: aterros Riga e Liepaja
México, Monterrey
Polônia: aterros Torun, Gkansk-Szadolki, Krakow-Barycz e Legajny-Olsztyn
África do Sul: aterros Durban, Mariannhill, Bisasar Road e La Mercy
Turquia: aterro Kemerburgas, Istambul
Uruguai: projeto piloto no aterro Las Rosas, Maldonado
Descubra o enorme potencial de recurso do GAS
Explore nossa Câmara de compensação e participe nos fóruns de discussão
Una-se à IEGAS
Encontre as respostas às perguntas mais freqüentes FAQs
Contate-nos
Ingles Español Portugues
 
Síntese

The SIMEPRODESO´s landfill is located in the north side of Salinas Victoria, Nuevo Leon in the district of Salinas Victoria. The landfill was established on a Greenfield site with a total landfill area of 212 hectares. Since operation began in September 5, 1990, the landfill has been taking mostly non-hazardous domestic and commercial waste as well as some non-hazardous hospital and industrial waste. This landfill receive actually 750 trucks daily (approximately 4,500 tons per day of Municipal Solid Waste).

The 44 ha cell, from which the biogas will be collected, was filled with 7.7 million tons of waste between 1991 to 1999, at which time it was filled and capped with clay. The landfill continues to accept waste and is expanding to fill other cells in the 212 ha site.

The site is currently generating energy.



Site Information

Start of Landfill (Year): 1990
Closing of Landfill (Year/year expected): NA
TotalSite area (hectares): 212
Area Designated for Land Filling (hectares): 44
Currently Expanding
Estimated site Capacity at Time of Site Closure (Million tons): NA
Estimated Capacity of Waste in Place (1999)(Million tons): 7.7
Annual Waste Disposal Quantity (2003)(Million tons): 1.6
Installed capacity: 7 MW

Baixar o informe do estudo de casos (PDF)

Acrônimos (PDF)

Anexo I (PDF)

Anexo II (PDF)

Anexo III (PDF)

Anexo IV (PDF)

Anexo IV-B (PDF)

Anexo V (PDF)

Anexo VI (PDF)

Anexo VII (PDF)

Anexo VIII (PDF)

Anexo IX (PDF)

Anexo X (PDF)

Anexo XI (PDF)

Anexo XII (PDF)

Anexo XIII (PDF)

Anexo XIV (PDF)

Anexo XV (PDF)

 
Contact Us | Help/FAQ | Index | Search | WB Home
© 2003 The World Bank Group, All Rights Reserved. Terms and Conditions. Privacy Policy.