Contact UsHelp/FAQIndexSearch 

Home About Countries Data Evaluation Learning News Projects Publications Research Topics
Search GO   

Home > Tópicos do Dev > Iniciativa de obtenção de energia... > Veja o desenvolvimento... > Brasil...

Página Principal
Acerca da iniciativa
Financiamento de estudos de pré-viabilidade
Entre à Biblioteca IEGAS para encontrar ferramentas que o ajudem a planejar projetos GAS
Estudos de Pre-viabilidade
Veja o desenvolvimento de outras atividades de projeto que se realizam no mundo
Brasil: Projeto “NovaGerar” para os aterros sanitários de Marambaia e Adrianópolis
Canadá: região onde se localiza o aterro Waterloo
Chile: aterros La Feria, Lo Errazuriz e Lepanto no aterro Santiago e Valparaíso
Latvia: aterros Riga e Liepaja
México, Monterrey
Polônia: aterros Torun, Gkansk-Szadolki, Krakow-Barycz e Legajny-Olsztyn
África do Sul: aterros Durban, Mariannhill, Bisasar Road e La Mercy
Turquia: aterro Kemerburgas, Istambul
Uruguai: projeto piloto no aterro Las Rosas, Maldonado
Descubra o enorme potencial de recurso do GAS
Explore nossa Câmara de compensação e participe nos fóruns de discussão
Una-se à IEGAS
Encontre as respostas às perguntas mais freqüentes FAQs
Contate-nos
Ingles Español Portugues
 
Síntese

The subject of this case study is the Nova Gerar project, the only project in Brazil that has received a positive approval from an international finance agency. Operations in the new landfill began in January 2003.

Nova Iguaçu is a municipality, about 30 kilometers from the city of Rio de Janeiro, with 920,000 inhabitants, most of which live in urban areas. Household waste generation is around 800 metric tons/day; the collection service is operated by a private company and it serves approximately 90 % of the population

NovaGerar will invest in a gas collection system and a modular electricity generation plant (with maximum capacity of 10 MW in Adrianópolis and 2 MW in Marambaia), in order to produce electricity to supply to the grid and reduce emissions of ca. 12 million tons of CO2 (conservative estimate) over the next 21 years. Project life and the emission reductions crediting period is 21 years, starting in the end of 2003.



Site Information

Start of Landfill (Year):
Old Landfill(Marambaia):
New Landfill(Adrianópolis):
 
NA
2003
Closing of Landfill (Year/year expected):
Old Landfill:
New Landfill:
 
2003
2022
TotalSite area (hectares)
Old open dump(Marambaia)(hectares):
New Landfill(Adrianópolis)(hectares):
 
20)
120
Area Designated for Land Filling (hectares)
Old Landfill(Marambaia)(hectares):
New Landfill:(Adrianópolis)(hectares):
1st.phase:
Final:
 
20
 
16
96
Estimated site Capacity at Time of Site Closure (Million tons):
Marambaia open dump(closed Feb 2003):
Adrianópolis landfill(2022):
 
1.845
9.968
Estimated Capacity of Waste in Place (May 2003)(Million tons):
Marambaia open dump):
Adrianópolis landfill(2022):
1.845
91.800
 
Anual Waste Disposal Quantity (2002)(1.000 tons): 234
Installed capacity:
Old Landfill(Marambaia):
New Landfill(Adrianópolis):
 
2 MW
10 MW

Baixar o informe do estudo de casos (PDF)(1.816 KB)

 
Contact Us | Help/FAQ | Index | Search | WB Home
© 2003 The World Bank Group, All Rights Reserved. Terms and Conditions. Privacy Policy.